Supply & installation of 4 x 8.4 kW Daikin high wall splits into School Hall
The outdoor unit compressors were mounted on brackets & enclosed in black powder coated cages for protection. We located the outdoor units away from the indoor unit heads to ensure the special needs enclosure area was free of trip and fall hazards. We installed site specific manufactured Colorbond trunking to enclose pipework & navigate through the fence and around the corner
Our project at the Australian Museum – Long Gallery with our Construction partner AJ Bristow were we provided Air Conditioning and Ventilation Systems with